Case Study: Toilet Renovation at Wunderbar, Glasgow

--

Project Overview

Come Fae Homes tackled a 5-day renovation project at Wunderbar in Glasgow. The mission: revamp 1 accessible toilet and 2 staff toilets, and replace doors that were no longer fit for purpose.

The Challenge

Time was tight, and the doors needed replacing, adding another layer to the project. Quality couldn’t be sacrificed.

Our Solution

We hit the ground running at 3am on Monday, working until 9am, and then shifted to our regular hours. New, sturdy doors were installed, elevating the overall functionality and aesthetic.

Results

By Thursday, the accessible toilet was back in action, ready for the weekend crowd. The staff toilets were also completed within the 5-day window.

Client Feedback

Our client was blown away by the transformation, saying, “It’s amazing! Can’t believe how much has changed in such a short time.”

--

--